Saturday, 10 December 2011

Throughout the day we have been engaged in editing our music video footage, we still have a long way to go, it is proven that the production of the music video is way more difficult to our thriller, below is a print screen of what we have edited so far. 


Thursday, 8 December 2011

More music video editing

Today is going to be very difficult and busy as we will be editing our music video. Our first task for today is to put our video clips that we've recorded in synch with the song we have chosen to create our video for this will take some time as we plan to reveal a lot of fast editing. 

Wednesday, 7 December 2011

New task ahead

We did manage to finish editing out the bloopers the first time we worked on the project. Today we will be piecing together the parts that we planned to put together, this is the most difficult part of the editing as we will need to keep the lip syncing in sync. If the lip syncing isn't perfect then it will look awkward.  

Tuesday, 6 December 2011

The music video footage

We have finally and successfully gathered all the footage we need from our first location where filmed. Today we will begin to edit the footage; our first task will be to decompose any mistakes within the footage this may take a while we gathered a lot of footage that contain many bloopers. If there I enough time spear we shall begin to construct the rest of the footage. As a whole we know we have a difficult task ahead and will time sometime to complete. 


Here's a print screen of what we have 

Using Final Cut

This is a print screen of Final Cut, this is where all our footage will be loaded onto so it can be edited. The top left of the print screen is where all the footage will be stored and it will allow us to place video images onto the the bottom part of the print screen where we can cut part of the video we don't want or onto the top middle of the print screen which will allows us to adjust and modify. The top right hand side of the print will allow us to preview our video  in real time.

Monday, 5 December 2011

Unfortunate situation

Unfortunately we didn't get the chance to film the view we wanted on the first day of filming our music video because of personal issue that occurred before leaving to proceed our destination. 
So today we will be sure of getting the footage we need and will be leaving shortly. Hopefully today will be successful so that we can begin editing as soon as possible. 

We begin to film music video

Today we will be travelling to London by train from Dageham East Station to Temple in London. We Do have high hopes of doing all our filming in this one day but if not we will surely complete it the next day which is tomorrow. We hope to get to Temple at around 4pm just when sun is setting as this is the view we desire to capture. It will take us approximately 1 hour to reach the destination so we will leave around 2:30pm, we don't want to miss the view we want to film so we will leave half an hour earlier in case of transport delays. 


Equipment needing for a successful day of filming are:
Oyster card
HD cam recorder
Tripod
costumes 


Today we plan to film all of the singing within in the song we've chosen. As soon as all our filming is complete the sooner we can edit our footage we hope for the best.